Talking of which, the last time I posted an update here, Dan Fraga had reached around 1,400 days since opening his Pineapple perception comic campaign.
IIRC, I posted that in early/mid February 2024.
Also IIRC, the campaign opened on April 25th 2020 and was designated ‘in-demand’ June 2020. Fulfilment (again, IIRC) was supposed to be September 2021.
So if all my IIRC are indeed, correct, then a day 1 backer of Fraga’s comic has been waiting approximately 1,473 days for their book (just over 4 years of course)
Off the top of my head, as well as the (in)famous and oft-quoted CG Sistine Chapel comparison, Fraga’s comic is now taking longer than:
- The construction period of 5 of the 7 World Trade Centre buildings; also perilously close to surpassing the construction periods for WTC 1 and WTC 2;
- Construction of the Eiffel Tower (a mere 2+ years);
- The design, tender AND construction of the Empire State Building (altogether 2&1/2 to 3 years depending on source);
- ‘The Last Supper’, another famous religious fresco this time by Leonardo, for the Santa Maria in Milan - admittedly a fraction of the size of the Sistine’s fresco - 3 years according to scholars.
The fucking utter shame upon these grifting scumcunts.
(*apologies for the multiple estimates in the post, not able to access my older posts for some reason right now)