JustStopDude
kiwifarms.net
- Joined
- May 7, 2017
The problem with this is that it completely eliminates the ability to meet the rapid redeployment goals.It would have to be moved the same way they intend to move ships to Florida form Texas. So it would have to be set down on a ship that would lay it on its side or some sort of vertical framework on the barge could be built. I'm not saying they should do this for all launches but it should be there as a backup if things don't look quite right or if they need to reduce the risk of damaging the launch hardware in the event that they need to do a large number of launches in quick succession.
The entire idea behind landing the main booster and upper stage back at pad II is so they can processed within a week.
You can't do that with a barge.