- Joined
- Oct 17, 2021
Timothy Allen Jenkins / Glass / Chaoticy / ChickenDeek / GlassWindowYT / raichu2514 / Swag__ / TanderBoy / MertAlbay / PampaHD / PampaGO / Sude31TR / StaticyJ / Staticy1 / f100001697037190 / Niggis
Intro created by @MK3






Disstrack on Glass made by FlashieBoi
Intro created by @MK3






Disstrack on Glass made by FlashieBoi
Timothy Jenkins aka Glass is a 26-year-old VRChat/Garry's Mod Trolling YouTuber who has been rising in popularity thanks to the rise in VRChat trolling videos, however, his career has taken a nose dive after his embarrassing breakup with his e-girl became public knowledge as well as his other controversies causing him to sperg out at his fans on a livestream
Early History
Timothy's earliest known online presence can be traced back to his 2008 YouTube channel, raichu2514, later renamed to Chaoticy. In which he would post a variety of content but then switch to making primary content about a rhythm game called Osu
The channel didn't receive as much attention as he wanted to causing him to switch to a new one, Glass. At first, he would make Garry's mod-trolling videos
While these videos got more views than on his other channel, they were still far from being popular, however, over at TikTok, a new genre of content started blowing up, and the content in question was "VRChat Trolling Videos". With this sudden popularity, many people started hopping on the bandwagon in hopes of getting views, Tim, already known for trolling people in the game, decided to try it out.
The first video he made almost instantly outperformed the other content he was putting out before that, so he decided to capitalize on it, making video after video after video about VRChat and making a name for himself in the community. With this amount of attention on him, he decided to create a Discord server to allow his followers to chat with each other, and this is where the troubles began
Allegations
1. Zilia
In Glass's video, "I GOT CANCELLED IN VRCHAT", decided to include a section where he talks about the allegation that some people have been bringing up against him
According to Tim, a person under the name Zilla joined his Discord server and accused Tim of copying a different VRChat troll, ProximityChat, causing a small Internet sissy fight between them, and due to this Tim believes that Zilla and Proximity were working together in some weird GayOps operation to start drama with him

The reality is Zilla wasn't in his mid-20s and he's not an alcoholic either, he would only become 18 in 2025

Zilla later revealed that the reason why Tim got angry at him was because he suggested making more short-form content to get better views, this apparently offended Tim causing the slap fight to transpire. But where did Tim get the 25-year-old alcoholic thing from? It's most likely because Tim misunderstood a DM Zilla and he had after the slap fight in which Zilla asked for Tim's age to which he jokingly said he was 13, Zilla responded with 25, Tim's actual age

But what's that audio file Zilla put in his message? Oh that's nothing, it's just Tim threatening to rape him on Discord
Well that doesn't look good and Tim knows that too so he decided to employ another Gazzilion IQ move, accuse Zilla of being a pedophile
Tim did ALL OF THIS just because someone suggested him to make short-form content to get more views
Keep this in mind as we go along
2. Zwo
On August 7, 2024, Tim is recording his trolling video as he always does and runs into these 2women in the VRChat lobby, Zwo and Daisy

He decides to troll them as he always does but one of the girls brings up this (Note: they don't know that the person they're speaking to is Tim)
This accusation she brought up was completely fabricated, Tim confronted her telling her she needed to provide evidence which caused a pretty heated 1-hour debate between them. Tim eventually decided to just add her to his Discord in case the clip would pop up which didn't happen because the clip was never real to begin with, so he pretty much doesn't have any reason to talk with her, right?
Well, you see Zwo was an OnlyFans model who just happened to play VRChat in her free time and Tim was just tryna fuck
Note: The DMs you are about to see were all leaked by Tim himself, he stated that "he's not ashamed of a single message he sent in that conversation" (Archive of these messages are in the attachments below the post)

As it was said before, Glass added her to the server and almost immediately found out that the "evidence" wasn't real at all

However, right after this, his tone suddenly changed

Keep in mind that during these conversations Tim was also dating someone else

Tim was so obsessed with trying to get laid by an OnlyFans model that he was willing to ditch his current gf after only speaking with Zwo for 7 hours

How do we know they only talked for 8 hours? We know that because Glass had given the exact time of their meeting in his video "I GOT CANCELLED IN VRCHAT" which was 7:47 AM.
When Tim and Zwo started talking with each other, Zwo had recently broken up with her ex but was still talking with him, leading her to a period where she did nothing but drink. Because of this she wasn't really thinking straight for the first few days of knowing Tim


However, Zwo did admit that she did have some interest in him at first but lost all interest as they went on
Tim would message Zwo every single day, Zwo would start to get annoyed by this as the vast majority of the conversations they had were about OnlyFans and the shit Tim managed to record

Time of knowing each other so far: 8 hours
Tim was being very pushy about OnlyFans and was fantasizing about moving in with her



Time of knowing each other: 2 days
As you can imagine it's all become pretty overwhelming for Zwo and she was doing her best to play it all off however it's very obvious that the energy is not there

Time of knowing each other: 4 days
It's at this point that Tim starts having doubts about the relationship. This is where his messages start to become a little creepy

Time of knowing each other: 22 days (all messages onwards are from the same day, and the last ones are from the next 3)
He's starting to get desperate

It's at this point that he pressures Zwo to finally speak her mind about what she thinks about them being together


>I just personally don't really feel like being in a relationship right now
>iI just don't think I'm ready or really want to do a long-distance relationship even if u could come it is really overwhelming and too soon

This message would lead to a complete meltdown, paragraph after paragraph after paragraph of desperation, Tim couldn't handle rejection




Zwo tried her best but she couldn't calm him down

It's at this point Tim begins to enter the stages of grief

Along with his manipulation tactics in a desperate attempt to make her feel guilty and make her come back to him

Despite Zwo's attempts at telling him to leave her alone, Tim would still bombard her with messages begging her to explain "what changed" and "how he could get her back"



His desperation got so bad he threatened to harm himself


After 3 days of pressure, Zwo started sharing these DMs with her friends, one of who decided to post them on Instagram, including Tim's facedox. People would start talking about this in several Discord servers, one of which was a fan of Tim who notified him about this situation in the DMs. This is when Tim decided to publish all the DMs they had between each other, from which we gathered all the previous screenshots

When he published this everyone was confused, nobody was really keeping up with Tim's personal life like he thought they were




Zwo also put out some vague tweets talking about the manipulation she had gone through


Btw, he did actually record her crying while she was drunk

Tim tried to talk to Zwo directly but she refused

Tim decided to take matters into his own hands, he booted up VRChat in the middle of the night and tried to hunt down her in the lobby to harras her on camera, after 10 minutes of searching he found her leading to this interaction
Remember the Instagram leak? It actually happened directly because of this interaction, but now that everyone knew about his breakup he started making live streams where he would stalk her using alt accounts
Yeah I understand these people have a really annoying voice, but forgive them for now
Tim would ask his fans on Discord to notify him every time they saw Zwo

And would also encourage his followers to harras her Twitter

After realizing that this would make him look bad he decided to completely DFEd his entire server, wiping all the evidence, unfortunately for Tim, most of the evidence survived
3. Yuki
Yuki is a woman who was a long-time fan of Tim, through Tim's Discord server she got to know Zwo and after learning about the breakup the two had she decided to go undercover to see if Tim treats all the women like he did with Zwo. Although Tim was initially skeptical, she managed to convince him to believe she was the one and was on his side

Having to learn from Zwo, he was now a little more careful this time around, he knew that Yuki and Zwo knew each other and he would use Yuki in order to stalk and gather info on Zwo


Something you should note about Yuki is that she's schizophrenic and Tim was aware of this

She was also self-harming and Tim would enable her by asking her to send him pictures


While Tim told her he wasn't looking for a relationship it would be every evident that he was at least wanting to try it


Even wanting to put a collar on her

But after 2 days he found out that she's been leaking DMs

Since he got backstabbed he started to enact his revenge against her
In a desperate attempt to make himself look good, he started showing DMs to people in the VC while at the same time texting her about how everyone is laughing at her, Tim is doing this to weaponize her schizophrenia against her

So let's see how he spans the situation
At this point, you can begin to see a pattern of behavior. Tim gets to know someone, learns about them and manipulates them into doing what he wants. Then, whether he is right or wrong, he makes up a narrative and moves on.
If Tim seriously knew that Yuki wasn't serious then why did he added her to Telegram, and if he was just trying to be nice, why did he wanted to put her into a shock collar so badly?
Response to the allegations
Behind the scenes, a YouTuber, JumperXIIGaming, has been working on an extensive investigation of all of the allegations surrounding Tim resulting in the video you can see above. During his investigation, Zwo would receive constant hate DMs from Tim's fans, in response Jumper decided to make a secret trolling campaign to make Tim respond to the allegations.
Introducing
"Everything comes to light 9/22 2024"
This little message started spreading around Tim's Discord, Xitter and even appeared on his streams

Tim took it as a threat and responded with "9/13 the hammer will be dropped"

After this, Tim's trolling buddy, UrghBla, DMd Zwo asking for an interview, to which she declined.

Immediately after the rejection, the assumption started being made

Not even 10 minutes after the rejection of the interview, Tim would put out a tweet claiming that Zwo is planning to leak his dick pic

But here's the funny part, ZWO NEVER HAD HIS DICK PIC TO BEING WITH NOR WAS SHE AWARE ONE HAD EXISTED. Tim had just admitted to sending dick pics to random people on the Internet. After this tweet, he was confronted by one of his fans on the livestream leading to this interaction
As you can see, Tim dug a hole for himself so much that his own community is starting to clown on him


With the backlash getting to him he decided to make a response video to the allegations and as you can imagine it's not a very good one
1. Tim claims that Zwo started the drama after putting out vague tweets you saw earlier, however, these tweets only came in response to his 3 days of harassment and stalking online
2. Tim claims that he never sent anyone after Zwo directly, well that's because he sent them INdirectly, by allowing people on his Discord to stalk her and linking her Xitter account on his Discord
3. Tim claims that Zwo leaked his face and DMs after his spergout at her in VRChat which you saw earlier. He completely glosses over the fact that by the time that interaction happened, Zwo and Tim had been broken up for the last 3 days
2. Tim claims that he never sent anyone after Zwo directly, well that's because he sent them INdirectly, by allowing people on his Discord to stalk her and linking her Xitter account on his Discord
3. Tim claims that Zwo leaked his face and DMs after his spergout at her in VRChat which you saw earlier. He completely glosses over the fact that by the time that interaction happened, Zwo and Tim had been broken up for the last 3 days
After the Jumpers video came out, Tim wasted no time and decided to boot up stream to respond to it. It was a complete disaster
quick bullet points
-He is some gay VRChat "troll" channel, his "trolling" is just walking up to e-daters and making fun of them. Nothing unique or creative, but the outrage is fairly funny.
-He despite his critiquing of VRChat e-daters, would then e-date an OnlyFans E-Whore known as "Zwoloft". She would reject his moves, he'd be pushy, and she'd make fun of him, leak photos / dms.
-He would also, while trying to e-date Zwo, was trying to e-date / sext some schizophrenic woman named Yuki (correction, i believe her name is Daisy actually? Glass refers to her as such. I might just be retarded.); who he encouraged to self-harm. Both of these women have leaked messages/recordings/photos etc of him.
-He has gone full schizo, and has done nothing but crash out like a retard since at least late August
He is coping in such a hilarious fashion, he's claimed not to have seen the video linked previously on him at the top of this page; all while making references to its contents implying he has actually watched some amount of it.
It was so bad that his Discord would ban everyone who would even DARE to talk about the Zwo drama in the chatHe's moral fagging AND showing all the mean words are getting to him; he's been banning people in the chat lol, he had to pause the video to urge his mods to ban niggas.
To make shit even funnier as I was typing this out he outright encouraged Zilla to be hung; Zilla being some (underage) teenager... all for making fun of him lmao
This stream is 100% gonna end with him killing himself LMFAO
EDIT:
The stream was a whole nothing burger, just him going "erhm ur a retard buddy pal guy. i didnt do that, but i did that, but i didnt do that. u r retarded. im a big brained guy, it was all bait, u r retards." lmfao. 2 hours of literally nothing to show he himself is retarded. will post archive when i can

>Shits over
Well, it seems like that wasn't the case for Tim

But this wasn't enough, he decided to make a 3RD stream about the situationArchive of Glass's second stream, Everything Comes to Light...
I was quite sick last night when he started streaming, so I only caught the last 6 minutes just about; in which he did nothing but repeat himself and take a clip of Zwo seemingly out of context to "prove" she is trying to twist the story to play victim lmfao.
Currently watching it in whole just to see and I'll update with an edit of some bullet points (LMAO never mind, there was nothing of any value in this. No shock!)
I had to put this on 2x speed really early on; because Glass reads at a fourth graders pace and reading level. Yes, I subjected myself to all 2 hours.
I said originally I'd update and break down or have a list of bullet points but honestly, there was nothing of any value beyond Glass trying hard to back pedal and go "well Jumper according to this guy with no proof says THE N WORD!!" and "IF YOU THINK IM WEIRD FOR E-DATING UNSUBSCRIBE" and "I DIDNT KNOW ZILLA WAS 17 WHEN I SAID I'D "VERBALLY RAPE" HIM GUYS I PROMISE"
This was just him trying to rephrase his whole original stream and not come off as a malding man-child, which failed miserably. I mean literally exactly 5:01 he bans a guy for making fun of him in chat, you can watch him do this and mald at him. He malds, claims hes not insecure while being insecure, and that "Jumper's career is over" all while he was actively gaining subscribers on the sub count that Glass himself put on stream. Lmfao.
Very little proof of Glass's claims but it is obvious Zilla and Jumper were trolling this guy, and it's worked so much better than Glass wants to admit.
Interestingly, he reiterates again at 1:39:15 though, that he wanted to be able to use Yuki's shock collar to "shock the shit out of her" which is hilarious, because so far he has painted only himself as a malicious actor wanting to literally hurt a woman he believes to have schizophrenia. Lmfao.
the whole TL;DW is Glass is an insecure simp faggot, especially for e-whores, Jumper says nigga/nigger and trolls people, Zwoloft is an e-whore and Zilla is just some kid.
the cherry on top is that he added Jumper's live subcount, expecting it to go down. it only went up the whole stream.

If you want to know how it went
The fans reaction was overwhelmingly negative





Eventually, he completely deleted all the videos, streams, and community posts about the drama, replacing them with whatever the fuck this is

(https://archive.fo/VdBWQ)
He tried to ignore the situation and go back to streaming VRChat like nothing happened, however his fans would resort to trolling him back on his VRChat. His streams now devolved into people chasing him and yelling nigger / faggot or making fun of him for fumbling Zwoloft lmfao. Someone started playing his DMs in an AI voice and he called them a "loser pedophile ass" lol. One of the clips from the stream:
The compilation of him getting trolled by @MK3

He also made a stream where he claimed that Glass had been "talking" to one of his discord moderators, "Swan" and that "Swan" is barely 17 and their relationship is "weird"
He also would trust Hitler over Glass
Glass's ex-girlfriend, "Astrid" is a PEDOPHILE according to UrghBla AND Glass himself, Glass made references to this in a few streams but I do not have the clips, however, UrghBla played this to close the stream - now private
In response to Urh's stream, he decided to do his own. The stream didn't even start and he was already being cooked in the chat


His community had completely turned against him, all that he had left was his Discord hugbox that he made after he literally banned everyone who made fun of him. The situation was so bad that his jannies left him


Trolling YouTuber crying about harassment

Tim's mad because people are trolling him on Discord
The breakup with UrghBla caused him to have a mental breakdown




>Calls UrhBla fragile
>Has a mental breakdown in e-girls DMs
>

More coping

After his mods left he had a mental breakdown on the server, crying about harassment



This is the funniest part:


>I just wanted to stream and have a good time
>Dog whimpering noise








Calling UrhBla a pedophile again

His streams turned into him coping and seething about the haters and the Kiwifarms thread
Unfortunately for him, the thread did not die in a week
He would even read the posts from the thread on his stream
Despite his claiming of being done with VRChat, he would still stream it because his views were falling out. But as you know, in VRChat everyone hates him and makes fun of him leading to some embarrassing interactions
Like one time he got owned by some drunk guy who recognized him
During one of those streams, Tim encountered someone who apparently knew about a minor with whom Tim was talking when she was 17
After this, his ex-friend and a fellow VRChat troll YouTuber UrghBla decided to look into this allegation and did an interview with the people involved including his IRL girlfriend
To summarize, the minor that he was talking about was a 17-year-old girl named Swan, to which Tim sent a dick pic. The stream also talked about his relationship with Astrid, who had mood swings and an alcohol addiction. Astrid had confessed to Tim that she had dated a 16-year-old and Tim continued to date her despite concerns, but it is unclear why they ultimately broke up
When this stream went live Tim went nuclear on his Discord and started crashing out yet again (Note: His full crash out can be viewed here because it's so long that I wouldn't be able to put it in here completely)
Asking to mass report the stream
Wanting to sue UrghBla
Despite this, he decided that the best strategy to prove his innocence is to "ironically" claim that everything said on stream is true
He would later boot up a stream where he would cope about the age of consent and him talking inappropriately with minors
This stream completely destroyed any credibility he ever had. Know he was known as a pedophile who sent a dick pic to a 17-year-old girl. He started crashing out yet again, coping about UrghBla







Some YouTubers started picking up this story, one of which was Mrow, who decided to host a livestream with Tim where he would give him a chance to speak his side of the story. Somehow, Tim managed to dig himself even further.
I highly recommend you watch the stream's highlights edited by @MK3. It's really long but it's worth every second of it
(https://preservetube.com/watch?v=-KVZkjFjs2E)
Conclusion
Timothy Jenkins is a man who built his entire career out of trolling people on the Internet but couldn't handle the slightest bit of backlash against him. He doesn't know what angle to take when responding to the allegations, should he cry about not being taken seriously and being made fun of or should he boot up his Internet Tough Guy persona and act as if he's the one winning? He can't decide which route to take and just decides to do both which doesn't work and causes people to troll him even harder. He is in a repeating cycle where everything he does is being made fun of and he just can't help but to feed the trolls. His channel, which he stated was his main source of income, is dying, his streams are becoming more and more boring to the average viewer and the only people who watch him are 5-6 A-logs. His career is going nowhere but he still believes that he can "bounce back" and prove the haters wrong with his success. His career is dead, no matter how many videos he makes, no matter how many times he streams, he will never bring back the momentum he once had, the fire is gone, and there's nothing left but he can't leave because YouTube is the only thing he knows how to do
Special thanks to the following farmers:
@Sprate Header | @DEAD BIRD | @Gravemind | @MK3 | @CplMayhem | @BeetleBug242 | @Decaying Husk | @FartMaster2001 | @thewholesandwich | @fair a day | @Gormelius Wimblefimble | @part timer
YouTube: https://youtube.com/channel/UCq0bSfDfXBwuqKIr8belFqw | https://archive.md/4HfNT
Facebook: https://www.facebook.com/timothy.jenkins.37 | https://archive.md/sNO0r
Old YouTube: https://youtube.com/channel/UC3F7CrrWWRjksVzvLrvXEnQ | https://archive.md/3lRIQ
Minecraft: https://laby.net/@Chaoticy | https://archive.md/UHQyW
Minecraft UUID: b7de46d4-0907-45c7-aad2-e5fcd2a50e9b
Osu: https://osu.ppy.sh/users/8044267 | https://archive.md/bG9Oo
Patreon: https://www.patreon.com/GlassWindow | https://archive.md/DpOe8
Old TikTok: https://www.tiktok.com/@glass_vrchat (Dead Link, No archives)
TikTok: https://www.tiktok.com/@glassyt | https://archive.md/wV3X3
Discord Server: https://discord.gg/chickendeek
Twitch: https://www.twitch.tv/glasswindow_ | https://archive.md/L8Mgt
Old Twitch: https://www.twitch.tv/chaoticyyt (Dead Link, No archives)
Xitter: https://x.com/GlassWindowYT | https://ghostarchive.org/archive/eTEPo
Old Xitter: https://x.com/Chaoticy_ (Dead Link, No archives)
Old Xitter (personal): https://x.com/StaticyJ | https://ghostarchive.org/archive/6Y18t
Pinterest: https://pinterest.com/raichu2514/ | https://archive.md/tqo0b
Kongregate: https://www.kongregate.com/accounts/raichu2514 | https://archive.md/kMnQh
Gravatar: https://gravatar.com/raichu2514 | https://archive.md/wip/Bv9pI
Imageshack: https://imageshack.com/user/raichu2514 | https://archive.md/wip/AaLkF
Smule: https://www.smule.com/raichu2514 | https://archive.md/wip/rwKaL
Soundcloud: https://soundcloud.com/raichu2514 | https://archive.md/wip/bhmRE
Facebook: https://www.facebook.com/timothy.jenkins.37 | https://archive.md/sNO0r
Old YouTube: https://youtube.com/channel/UC3F7CrrWWRjksVzvLrvXEnQ | https://archive.md/3lRIQ
Minecraft: https://laby.net/@Chaoticy | https://archive.md/UHQyW
Minecraft UUID: b7de46d4-0907-45c7-aad2-e5fcd2a50e9b
Osu: https://osu.ppy.sh/users/8044267 | https://archive.md/bG9Oo
Patreon: https://www.patreon.com/GlassWindow | https://archive.md/DpOe8
Old TikTok: https://www.tiktok.com/@glass_vrchat (Dead Link, No archives)
TikTok: https://www.tiktok.com/@glassyt | https://archive.md/wV3X3
Discord Server: https://discord.gg/chickendeek
Twitch: https://www.twitch.tv/glasswindow_ | https://archive.md/L8Mgt
Old Twitch: https://www.twitch.tv/chaoticyyt (Dead Link, No archives)
Xitter: https://x.com/GlassWindowYT | https://ghostarchive.org/archive/eTEPo
Old Xitter: https://x.com/Chaoticy_ (Dead Link, No archives)
Old Xitter (personal): https://x.com/StaticyJ | https://ghostarchive.org/archive/6Y18t
Pinterest: https://pinterest.com/raichu2514/ | https://archive.md/tqo0b
Kongregate: https://www.kongregate.com/accounts/raichu2514 | https://archive.md/kMnQh
Gravatar: https://gravatar.com/raichu2514 | https://archive.md/wip/Bv9pI
Imageshack: https://imageshack.com/user/raichu2514 | https://archive.md/wip/AaLkF
Smule: https://www.smule.com/raichu2514 | https://archive.md/wip/rwKaL
Soundcloud: https://soundcloud.com/raichu2514 | https://archive.md/wip/bhmRE
This private information is unavailable to guests due to policies enforced by third-parties.
Attachments
Last edited: