First of all, this is a macro shot of what they
wanted were hired to build, close up so it can clearly be seen what they did wrong.
When retards build a dry stack field stone retaining wall, they think what you do is buy a few pallets of field stone and then restack the pallets in a line. WRONG. Fucking WRONG and KILL YOURSELF. Everyone make a note of the fact that fences of this kind are fundamentally as old as the first time some paleolithic cuck tried to keep his neighbor from walking over and fucking his wife. They are quite literally stacked rocks. It's baked into human DNA to stack shit. Any toddler learns to stack things neatly so they don't fall over. I won't go Zapruder film on those pictures but just LOOK AT THEM. Whole areas of the fence are at an angle. Perfect, beautiful, large pieces are just laying on the ground instead of being used to actually make the wall work, no attempt was made to find the flattest side of the stone or put it in the direction that makes the most sense, not one tiny section is plumb, little chunks are being used as cap stones, not one bit of it passes the eye test. To bring it down to a level that could be understood by the workers in that picture, where the FUCK have you ever seen an intact retaining wall with gaps you could fist fuck? I have no idea what these poor homeowners paid the tranch workers (cool looking house though), but hopefully it was nothing. Because they're about to pay a whole different group of workers to do this shit the right way.